Visual inspection of buildings

Our visual inspections of buildings cover the following main systems:

  • Structure
  • Exterior
  • Roofing
  • Plumbing
  • Electricity
  • Central heating
  • Interior
  • Insulation and ventilation

The duration of an inspection varies according to the building’s surface area, but usually lasts 2.5 to 3 hours for a building measuring 2,400 sq. ft. (basement and main floor).