Visual inspection of buildings
Our visual inspections of buildings cover the following main systems:
- Structure
- Exterior
- Roofing
- Plumbing
- Electricity
- Central heating
- Interior
- Insulation and ventilation
The duration of an inspection varies according to the building’s surface area, but usually lasts 2.5 to 3 hours for a building measuring 2,400 sq. ft. (basement and main floor).



